I'd like to point out that the tender for the LUH & UH listed things the aircraft must have (being essential) and things they should have (being desirable).
The 'shoulds' inlcude weapons, door mounts, the sling loads of 1000 & 1500kg for the LUH & UH respectively (the ability to sling load is a must, but the weights are a should) and the wire strike capability.
These shoulds mean that the manufacturers have a lot of leeway, so we shouldn't count out any design yet.
I'd also like to point out that the troop carrying capabilities have been listed as 8 troops in light order (115kg each).